LG =; LGCountry=
Secure your power supply with NO-BREAK E1
Vous êtes Local Informations Applications Turnkey Projects
  • 2015.11.20 In with the In Crowd – EURO-DIESEL attends DCD Europe 2015 with great results


    EURO-DIESEL attended DCD at London ExCel on the 18 & 19 November 2015; a key exhibition in the Data centre events calendar with over 130 speakers giving 90 sessions over the two days.   [+]

  • 2015.10.29 UK | New to the Team…


    EURO-DIESEL continues to enjoy one of its busiest order books, with projects secured from all corners of the globe, and the Company is building on this momentum and strengthening its UK sales team.  Rob Pitt, UK Managing Director comments:  “We are enjoying significant sales growth in many of the markets we serve worldwide.  Now is the time to capitalise on this momentum.  


  • 2015.10.26 UK | EURO-DIESEL Scale New Heights


    Lifting a 1500 kVA DRUPS onto the roof of a 10 storey building in one of the busiest areas of North London is no mean feat.

  • 2015.10.21 CHILE | Containerized units ordered by MOLYB filial CODELCO


    Pictures of containerized units ordered by MOLYB filial CODELCO presently transiting to their final destination in Mejillones (Chile). The units will be set to service before the end of the year. 


  • 2015.09.22 BELGIUM | Great visibility for EURO-DIESEL at Talentum


    On Thursday, September 17, 2015, Stijn Briers, Partick Scarpa, Manuel Santiago Fernandes, Corinne Volders and Hélène Herwats attended one of the most known job fairs in Belgium: Talentum; it was the regional edition which took place in Liège.


  • 2015.05.29 Agreement for the acquisition of EURO-DIESEL by 3i


    On 19th May 2015, the international investment manager 3I Group plc (“3i”) has reached an agreement with our current shareholder Buy Out Fund for the acquisition of our company.


Turnkey projects

Designing, installing and maintaining of the NO-BREAK E1

As a solution provider for more than 20 years, EURO-DIESEL is prepared to not only design electrically and mechanically reliable and efficient solutions, but also to take full responsibility to execute these projects on a turnkey basis. Our turnkey solutions comprise of, but are not limited to:

  • Design, manufacture, test and deliver one or more NO-BREAK E1 systems
  • Design, supply and install the associated DRUPS in LV or MV switchgear
  • Supply and install the associated control and power cabling
  • Design and install the diesel engine exhaust system to meet local noise attenuation standard
  • Design and install the diesel engine cooling system consisting of either direct driven radiators, remove (horizontal or vertical) radiators or heat exchangers
  • Design and install the room ventilation system including air inlets and air outlets
  • Design and install the diesel engine fuel system consisting of daily fuel tanks, pumps and eventually bulk fuel tanks. All in accordance to local regulations and standards
  • Test and commission the NO-BREAK E1 system and auxilliaries
  • Document the design by providing "as built drawing" with maintenance and operation manuals
  • Train local staffs and maintenance partners, if required


Example of a room layout design

Room layout



Turnkey solutions are also provided as modular solutions

Containerised Layout